Lakeside Riverpark
Fire Administration and Operations Facility


Riverpark Fire Station Documents

Project Plan


Information for Demolition Bidders

Demolition Request for Proposal
Asbestos Report


Information for Grading Bidders

Grading Request for Proposal
Combined Technical Specifications
Geotechnical Report
Storm Water Pollution Prevention Plan

ROUGH GRADING ADDENDA NO.1 DOCUMENTS:
Rough Grading Addenda No.1
AT&T Shop Drawing
Cox Cable Shop Drawing
SDG&E Shop Drawing
Sign-in Sheet from Pre-Bid Meeting
Handout from Pre-Bid Meeting
Autocad drawing for existing topography
Structural Retaining Wall Supplemental Details

ROUGH GRADING ADDENDA NO.2 DOCUMENTS:
Rough Grading Addenda No.2
Geotechnical Report-revised
Structural Retaining Wall Supplemental Details-revised
Paving Plan

ROUGH GRADING ADDENDA NO.3 DOCUMENTS:
Rough Grading Addenda No.3
Storm Drain Revision
Diverter Valve Information

Information for Construction Bidders

Information should be available when grading is complete